wp77a508ed.png
wp72e5ba76_0f.jpg
wp8ce88b64.png
wp2facc0d5.png

 © 2012 AID AFRICA  UK Registered Charity Number 1116336

wp8895f4f3.png
wp05434c4e.png
wp8e4c5e1f.png
wp99a48959.png
wp6d699af9_0f.jpg
wpf4c36e60.png
wp6185648a_0f.jpg
We still facilitate education sponsorship to over 80 students at Secondary School, who, because of their family’s poverty, wouldn’t otherwise be able to attend.
Many of the children come to the end of our programme in December as they complete their final year. They’re poised now, nervously awaiting the results of their MSCE—important exams akin to our GCSE in the UK.  We’ve be liaising with Headmasters and staff to select other suitable candidates to fill their places.
Water is always a major challenge in the rural areas of Malawi.
The annual torrential rains hit from November, battering down flimsy houses, destroying roofs,  flooding fields, engorging rivers, and sweeping away seedlings, soil, even livestock. Then follows the long dry season, rivers shrink, the water  table drops,  and wells dry out.  There are some community water projects, but most in the remote areas rely heavily on boreholes for their water supply.
wpeb499d4e.png
So when a pump breaks down, it devastates the local community, forcing the women—the water carriers– to walk long distances
and use a huge portion of each day trudging to adjacent boreholes. The alternative is to risk their family’s health, and often lives, by taking water from polluted rivers or occasional wells.  
Once again, Wilmslow Wells joined with us to repair boreholes down in the Muona area. 5 were specifically planned, and the materials bought and transported to that area. About 3000 people have benefited from this work as clean, safe, drinking water has been restored.

Ladies carry water—sometimes for vast distances— in buckets on their heads, and we were astonished when we weighed a random bucket at 23kgs!
wpaf2dfec2_0f.jpg
wp1e476ace_0f.jpg
So help with the repair of boreholes is vitally important to these vulnerable communities.
Sikeyi Village bore-hole,
(serves 700 people)
under repair(right)
water flowing (left)
Repairs cost £145
wpa0484af8.png
 This is page 3 Autumn trip 2009
Autumn 2009
wpe80d7d65.png
wp54f7f445_0f.jpg
Changing lives .....
wpa88df7ae.png